Advertise with VetteTube!   -   Sponsors
Results 1 to 2 of 2

Thread: Lower end done

  1. #1
    Junior Member
    Join Date
    Apr 2012
    Location
    Des Plaines, IL
    Posts
    13

    Lower end done

    After trying a H/C build,Vid is on this site. I decided to rebuild my LS7 with 10k mi.so it could take 15 or more lbs of F1C procharger. Parts my builder used were,Ross 9.6 coated with ultra rods and magnum crank.A better drive line,suspension and twin oil coolers and cry02 system.Gauges will be accessable with heads up.400 miles to go before break in heat cycles are done and i will post its dyno video.

  2. #2
    Site Administrator Rob's Avatar
    Join Date
    Mar 2008
    Location
    New Hampshire
    Posts
    3,036
    Very cool!
    Rob Loszewski, Site Administrator
    VetteTube

    VetteTube Spotlight -

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •